(1)
Zongyi Fan; Wenxue Song. Sustainable Cost Management and Risk Evaluation in Prefabricated Infrastructure Projects under the Neutrosophic Bonferroni Mean Operator. Neutrosophic Sets Syst. 2025, 83, 910-926.