Priyadharsini. S, Kungumaraj.E, and Santhi. R. “An Evaluation of Triangular Neutrosophic PERT Analysis for Real-Life Project Time and Cost Estimation”. Neutrosophic Sets and Systems 63 (January 15, 2024): 62–81. Accessed July 16, 2024. https://fs.unm.edu/nss8/index.php/111/article/view/3874.