Evaluating Construction Projects of Urban Road and Bridge Based on Environmental Sustainability with MCDM Methodology
Keywords:
Decision Making; Environmental Sustainability; Construction Projects of Road and Bridge; MCDM Method; MOORA Method.Abstract
Evaluation construction projects of road and bridge has various criteria so, we used the
concept of multi-criteria decision making (MCDM) methodology to deal with these
criteria. The MOORA methodology is a MCDM methodology used to rank various
projects. MOORA methodology is integrated under the Plithogenic set to deal with
uncertainty data. The Plithogenic set is an extension of neutrosophic sets. Three experts
are invited to evaluate the criteria and alternatives. This study gathered seven criteria and
13 alternatives. We compute the criteria weights and rank the alternatives. The results
show the Environmental Impact Mitigation criterion has the highest weights and the
Long-Term Environmental Monitoring criterion has the lowest weights.
Downloads

Downloads
Published
Issue
Section
License
Copyright (c) 2025 Neutrosophic Sets and Systems

This work is licensed under a Creative Commons Attribution 4.0 International License.