NEUTROSOPHIC PROJECT EVALUATION AND REVIEW TECHNIQUES
Keywords:
Neutrosophic set, Single Valued Neutrosophic Numbers, Neutrosophic critical path, Neutrosophic expected task times, Neutrosophic variance, Neutrosophic set, Single Valued Neutrosophic Numbers, Neutrosophic critical pat, Neutrosophic expected task times, Neutrosophic varianceAbstract
One of the most important and challenging jobs that any manager can take in the management of a large scale project that requires coordinating numerous activities throughout the organization. Initially, the activity times are static within the CPM technique and probabilistic within the PERT technique. Since neutrosophic set is the generalization of fuzzy set and intuitionistic fuzzy set, a new method of project evaluation and review technique for a project network in neutrosophic environment is proposed in this paper. Considering single valued neutrosophic number as the time of each activity in the project network, neutrosophic expected task time, neutrosophic variance, neutrosophic critical path and the neutrosophic total expected time for completing the project network are calculated here. The main concept of Neutrosophic Project Evaluation and Review Technique(NPERT) method is to solve the ambiguities in the activity times of a project network easily than other existing methods like classical PERT, Fuzzy PERT etc.The proposed method is explained by an illustrative example and the results are discussed here.
Downloads
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.